Tuesday, January 15, 2008

Showshifter 3.12.2945 Reg

Moroccan Historical Center

Moroccan is a building of 11 storey residential use, is located in Moroccan 32, esq. Independence, Cologne Centro, Cuauhtémoc in Mexico City.

Wednesday January 2: Structure of the building under construction. Model of Development: Render Property:
Website developer: www.lomelin.com.mx Buildings Blog
Mexico

Ivan TMY ©, January 2008. Reform

Saturday, January 12, 2008

The Cat In The Hat Balloons



27 is a skyscraper of 25 levels and 108 meters high, its function is completely residential.
Location: Paseo de la Reforma 27, Colonia Tabacalera, Delegación Cuauhtémoc, Mexico City.

Wednesday January 2, 2008: It looks like the land on which to build reform 27. Render Project: Blog Buildings in Mexico. Ivan
TMY. January 2008. Edificios_mexico@hotmail.com 489

Thursday, January 10, 2008

Wholesale Laptop Dubai

Reforma Reforma 489 27

Reform Annex of the Torre Mayor is a small building with 7 levels with 7 thousand square meters. Its use will be office and will have a four-level underground parking to provide quota to 408 cars. With an investment of $ 30 million International Reichmann, the Canadian company laid the foundation stone of the building.

Located on the Avenida Paseo de la Reforma 489 in the colony Cuauhtemoc Cuauhtemoc, Mexico City, right next to the huge Torre Mayor.

construction referred to in 18 months, so the new building completed in 2009.

Wednesday, 12 December 2007.Cartel report on the construction of the building: Land Appearance: Render

Space:

August 30, 2008: concrete columns and a crane began to lift the building. November 8, 2008: The building has reached its final height and begins to take shape of your design. February 20, 2009: The building has been covered with a glass facade. May 9, 2009: Final appearance of the Annex to the Torre Mayor. Blog
Buildings Mexico.
(www.edemx.com, the website of the Buildings of Mexico)
TMY © Ivan.

Wording For A Congratulation Engagement Card

Torre of the Mexican Union of Electricians.

Location: Downtown Insurgentes No. 98, Col. Tabacalera, Del. Cuauhtémoc in Mexico City.
About 10 stories high.
Use: Auditorium and Offices.
Contractor: BOSCO buildings.
Status: Under construction.

Monday June 25, 2007. The huge crane has been erected in the fields of Tabacalera.


Saturday 29 September. The metal structure is growing rapidly, and people smoke is seen by the steel beams.

Saturday January 12: This video shows the progress of the work, which is near completion.

Mexico Buildings Blog.
Drafting and images © Ivan TMY.

Why Can You Not Use Canesten When Breastfeeding?

Embassy Suites Hotel. Bicentennial Tower

luxury hotel 19 stories high located on Paseo de la Reforma in front of the monument to Christopher Columbus, Colonia Juarez, Cuauhtemoc, Mexico City.

Status: Completed in 2006.

Tuesday January 25, 2005: The book is a breakthrough in construction, have already built 12 of the 19 levels.
Friday March 18, 2005. The work still continues to rise.
Friday November 24, 2006. Final view of hotel construction completed.
Buildings Blog of Mexico, Ivan TMY ©, edificios_mexico@hotmail.com

Female Genital Tattooo



Modern tower whose height is 300 meters and 70 floors, will be used as an office and business center plus it will feature restaurant and shopping center, the architect Rem Koolhaas, is planning to list on September 16, 2010.

Location: Pedrgal 24, Colonia Molino del Rey, Del. Miguel Hidalgo, Mexico City.

Status: Approved construction. Friday

August 10, 2007: This is the Super Service Lomas building is planned to demolish it to build in this area the Bicentennial Tower, on the facade of the building's former alert site owners who are retiring, but residents also complain that no build the tower, as they say, will be deficient in energy and water supply and drainage, the INBA (National Fine Arts Institute) opposed the construction because the building Lomas Super Service is protected by this institution because of its historical value, the Miguel Hidalgo delegation is opposed to the expropriation of the property because it does not allow the construction of buildings over 4 stories at that site. The pilots say that their ships transiting the area and runs the risk of an accident aviary, these are all the controversy regarding the construction of this tower.

Poster of the colony vecionos Molino del Rey and surrounding area shows the rejection of the tower in its delegation and colony.

Renders de la Torre.

Official Site: http://www.torrebicentenario.com

Site

Edema http://mx.geocities.com/edificiosdemexico/Rascacielos/Torre_200.html

The Buildings Blog Mexico, Ivan TMY ©, edificios_mexico@hotmail.com

Error 20 Aeg Washing Machine

Superior Court of Justice of the City (TSJDF). 243

Office Tower Superior Court of Justice of the Federal District.
Height: 89 meters
Floors: 19
Architect: Ricardo Legorreta.
Status: Completed in 2005. The parking lot is under construction.

Friday December 10, 2004. The construction of the tower shows a significant advance. Saturday February 12, 2005. The building is almost complete, the crystals have been installed in 90%. Saturday May 21, 2005. The building is ready, begin to be conditioned to serve as offices.
Saturday November 18, 2006. The building now serves as headquarters TSJDF.
Saturday April 21, 2007. The parking lot is under construction, and has fine height and begins to be conditioned. Ivan
TMY, Buildings of Mexico.

How To Play Rosetta Stone Rsd



Office Tower 120 meters high and 28 floors. Location: Av Paseo de la Reforma 243 Col. Juarez, of. Cuauhtémoc. Mexico City.

Saturday May 26, 2007: The little blue building in the center of the photo will be demolished to make way for the great structure of Reform 243. Sketch house: TMY ©
Ivan, Blog Mexico Buildings, edificios_mexico@hotmail.com

Tuesday, January 8, 2008

Does Herpes Affect The Heart?

Reform Reform Plaza Residences

24-story tower residential use. GIM project by Plaza Residences Residential and Mexico City. Location: Av Paseo de la Reforma 77, Col. Juárez, Del. Cuauhtémoc, Mexico City.
Status: Under Construction.

Monday June 25, 2006: We are conducting the excavation of the site to begin to build the building. Sketch finished building.
Sunday April 20, 2008.
The huge crane began to build the steel structure of the building.
Saturday May 31, 2008.
Two cranes installed on the campus erected residential tower of 90 meters.
Saturday 14 June 2008.La metal structure has reached the 5 floors.

July 31, 2008: It is building on the 9th floor of the building.
October 25, 2008: The first section of the tower is reaching its final height, while a second crane slowly lifts the second section.
January 24, 2009: The first section has reached its final height, the metal frame of the second section rises rapidly.
February 20, 2009: The structure of the tower is about to reach its final height and shape their final form.
March 16, 2009: The first section begins to be coated with glass while the structure of the second section is to complete its construction.
May 9, 2009: Construction is rapidly progressing, the building already has its final height.
June 6, 2009: While the first section is almost covered with glass, the second starts conditioned.

Residences Plaza Official Site: http://www.plazaresidences.com.mx/ Buildings Blog
Mexico, edificios_mexico@hotmail.com
(www.edemx.com, website Buildings of Mexico) Ivan
TMY ©,

Tamil Kavithai In Marriage

90

Torre Residential 135 meters high and 37 floors. The developer's architect Bosco architects. The tower is planned to be completed in 2009. It is located in Paseo de la Reforma 90, Colonia Juárez, Del. Cuauhtémoc in Mexico City.

Status: under construction.

Monday June 25, 2007: The construction work has not started yet because the site was closed by the Federal District, once the fine is paid, the construction will resume. In the picture the arrow indicates the site where the tower will be erected.

Sketch of the finished building. Web Site Redesign 90: www.reforma90.com

Ivan TMY ©, Blog Mexico Buildings, edificios_mexico@hotmail.com